Page 2
Introduction Thank you for choosing S5850-24S2Q switch. This guide is designed to familiarize you with the layout of the switch and describes how to deploy the switch in your network. ID SYS 10 11 14 15 16 17 18 19...
LEDs Status Description Green 10G port is linked. Blinking Green The SFP+ port is transmitting or receiving packets at 10G. SFP+ Amber 1G port is linked. Blinking Amber The SFP+ port is transmitting or receiving packets at 1G. Port is not linked. Green 40G port is linked.
Installation Requirements Before you begin the installation, make sure that you have the following: Phillips screwdriver. M6 Screws. Standard-sized, 19" wide rack with a minimum of 1U height available. Category 5e or higher RJ-45 Ethernet cables for connecting the network devices. Site Environment: Do not operate it in an area that exceeds an ambient temperature of 45ºC.
Rack Mounting 14 15 16 17 18 19 20 21 22 23 40 G 40 GE Br ea ko ut 1. Secure the mounting brackets to the two sides of the switch with eight M4 screws. 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1...
Grounding the Switch ID SY S CO N ET H S 5 8 5 0 -2 4 S 2 Q 1. Connect one end of the grounding cable to a proper earth ground, such as the rack in which the switch is mounted.
Connecting the SFP+ Ports 14 15 16 17 18 19 20 21 22 23 40 G 40 G E Br ea ko ut First install SFP+ transceivers and then connect ber optic cabling to the transceiver ports, or directly connect DAC cables to the SFP+ slots. CAUTION: Laser beams will cause eye damage.
Connecting the Management Ports Connecting the Console Port ID SY S CO N ET H S 5 8 5 0 -2 4 S 2 Q 1. Insert the RJ45 connector of the console cable into the RJ45 console port on the front of the switch. 2.
Connecting the USB Port ID SY S CO N ET H S 5 8 5 0 -2 4 S 2 Q 14 15 16 17 18 19 20 21 22 23 40 G 40 G E Br ea ko ut Insert the Universal Serial Bus (USB) ash disk to the USB port for software and con guration backup and o ine software upgrade.
Page 11
Step 3: Open a browser, type http://192.168.1.1, and enter the default username and password, admin/admin. Step 4: Click sign in to display the web-based con guration page. Con guring the Switch Using the Console Port Step 1: Connect a computer to the switch's console port using the supplied console cable. Step 2: Start the terminal simulation software such as HyperTerminal on the computer.
Troubleshooting Loading Failure Troubleshooting After loading fails, the system will keep running in the original version. At this time, users should re-check if physical port connections are good rstly. If some ports are not connected, then re-connect them to ensure that physical connections are correct, and begin re-loading. If physical connections are correct, then check the loading process information displayed on the super terminal to verify if there are input errors.
Contact Us Product Warranty FS ensures our customers that any damage or faulty items due to our workmanship, we will o er a free return within 30 Days from the day you receive your goods. This excludes any custom made items or tailored solutions.
Need help?
Do you have a question about the S5850-24S2Q and is the answer not in the manual?
Questions and answers