3. Installation Overview
Follow instructions 1-4 to install and power on it.
1. Installation
2. Electrical Wiring
3. Test Run
4. Check LED Indication
No.
1
2
Wire striper
3
Crimping plier
4
Screwdriver
5
Refer to "3.1 Installation" to perform installation work.
Refer to "3.2 Electrical Wiring" for wiring and switch settings.
Refer to "3.3 Test Run" for turning ON to perform test run.
Check the POWER LED lights On and ERROR LED OFF.
Refer to "7. Indication (Normal and Abnormal)" for indication details of LEDs.
Installation Tool List
Name
Drill
Ruler
Picture
8
Remarks
Diameter: 6mm
/
/
Cross screwdriver;
Diameter: 6mm;
Length: less than 240mm
/