Download Print this page

Back View - Palram Silver Line Assembly Instructions Manual

Hide thumbs Also See for Silver Line:

Advertisement

Available languages

Available languages

*Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.
7
Assemble profiles A103,
A104 to the base using the
base inner holes and to
connector M285 in the
middle hole as shown in
drawing a & b.
Aluminum profiles A115 and
A116 are to be connected
at the back to the gutters
A136 on its upper holes and
to profiles A103 and A104 as
shown in drawing c.
NOTE: Assemble profiles
A103 and A104
simultaneously to the base,
using the base inner holes
and crossbars A256 on each
side.
A103 / 1
A104 / 1
a
Outside
A104
!
A103
Inner
hole
A115 / 1
A116 / 1
411
M285
412
412
A104
A103
412
411
!
411
412
Back
!
A103
b
411
411
411
A136
Back
!
view
A104
A116
c
A115
A116
M285
411
412
A104 A103
411
412
A136
Back
Back
view
A115

Advertisement

loading

This manual is also suitable for:

Green line