Certification
6.2 EMC and Environmental Type Tests
61000-4-8
61000-4-11
61000-4-16
61000-4-17
61000-4-18
61000-4-29
IEC 60255-5
a
Severity level set by Siemens.
b
Common mode tests performed on the signal port shield.
c
For IEC 61850-3 compliance when using Power-over-Ethernet (PoE), an IEC 61850-3 compliant PoE
power supply must be installed in the vicinity of the device with power cabling no longer than 3 meters
(118 in).
44
Test
IEC
Power Frequency
Magnetic Field
IEC
AC Voltage Dips, Drop-
Outs and Interrupts
IEC
Mains Frequency Voltage
IEC
Ripple on DC Power Supply
IEC
Damped Oscillatory Wave
IEC
DC Voltage Dips
and Interrupts
Dielectric Strength
HV Impulse
Description
Earth
Ground Ports
Enclosure
a
Ports
AC Power
Ports
Signal Ports
DC Power
Ports
DC Power
Ports
Slow
Damped
PoE Ports
DC Power
Ports
Signal Ports
DC Power
Ports
AC Power
Ports
Signal Ports
DC Power
Ports
AC Power
Ports
Test Levels
10 V
100 A/m Continuous for
1 min per IEEE 1613.1
1000 A/m for 1s
1000 A/m for 1s
Dips 30% (1 cycle at 50
Hz and 1 cycle at 60 Hz)
Dips 60% (50 cycles at 50
Hz and 60 cycles at 60 Hz)
Drop-Outs 100% (5 cycles
at 50 Hz, 50 cycles at 50
Hz, and 60 cycles at 60 Hz)
Interrupts 100%
(6 cycles at 60 Hz)
30 V Continuous
300 V for 1 s
10%
2.5 kV common
1 kHz or 1 MHz
 
30% for 0.1 s
60% for 0.1 s
100% for 0.05 s
2 kV (Fail-Safe
Relay Output)
2 kV
2 kV
5 kV (Fail-Safe
Relay Output)
5 kV
5 kV
Installation Manual, 04/2021, C79000-G8976-1172-07
Severity
Levels
3
a
Note
5
 
4
3
3
c
Note
 
 