Hull Unit Installation - Honda Hondex HE-773-III-Di Operation Manual

Table of Contents

Advertisement

HULL UNIT INSTALLATION

Please refer to operation manual supplied with auto hull unit for auto hull unit.
1. Cut off Upper/Lower shafts according to pipe length Lt and remaining length Yt.
Shaft Length : Pipe Length (Lt) + Stroke + Hand ing Length (Yt)
Standard Length : 1000mm
2. Put the marking at lowest position of Upper/Lower shaft
(excluding the remaining length).
Marking Position : Pipe Length (Lt) + Stroke – 130mm
Shaft length:Pipe length(Lt)+Stroke+Handing length(Yt)-130mm
Handle with care
Pipe length(Lt)+Stroke-130mm
3. Let Tx/Rx cable through Upper/Lower shaft.
Handing Length(Yt)
Supplide pipe Length-1000mm
Draw line mark
Draw line mark
71
Handling Length(Yt)
130mm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents