SPECTRAN V5
QUICKGUIDE
*Optional Docking Station
In order to use the docking station correctly,
note that the device must be properly placed
in the docking station. The „A" of SPECTRAN
should only be half-visible, the "e" of Analyzer
should be completely visible.
Powermeter
1
Sync In/Output or Powermeter
(not implemented yet)
RF Input
2
50 Ohm RF input
Tracking Generator
3
Tracking generator output
(not implemented yet)
Power-LED
4
The LED flashes green/red while the device is
booting and blinks orange while the device is
powered up.
On/Off Button
5
Turns the device on. The screen remains black
for about 15 seconds, while the device is boot-
ing. It is ready for use after the „beep" sound.
Clr/Undo Button
6
Clear data and change settings.
1
2
3
4
5
6
7
Scroll Button
7
Scroll button, controls the cursor and activates
functions.
Charge-LED
8
Red - battery is charging
Green - battery is fully charged
Custom Button
9
Configurable button (not implemented yet)
Menu Button
10
Open the main menu.
Fan cooler
11
Make sure that the fan is never obstructed, else
the device might not be cooled sufficiently
Speaker R/L
12
Speakers for demodulation
IMPORTANT:
fan clear of obstructions or you
might cause the device to over-
heat, which can result in damage
to the device.
11
8
12
9
Back
10
13
Side
16
14
15
Bottom
2,5mm Audio Plug
13
For headphones, ear-buds or speakers.
USB Slave
14
Mini-USB port for printer, storage, GSM, WLAN
connections.
Aaronia UHSC port
15
Ultra fast (4x3GSPS) Aaronia I/O connector.
µSD Slot
16
Supports Aaronia micro SDHC cards with more
than 10MB/s (not implemented yet)
Power Connector
17
Only use the original Aaronia Power Adapter
(5.5V, 6A/33W).
USB Master
18
Mini-USB port for the direct connection to a PC
Always keep the
17
18
Need help?
Do you have a question about the SPECTRAN V5 and is the answer not in the manual?
Questions and answers