SPECIAL INSTRUCTIONS—CONTROLS
Alternatively (using a wired remote controller), a forced test run can be executed in the procedure above
mentioned even if the operation stops by thermo-OFF. In order to prevent a serial operation, the forced test
run is released after 60 minutes have passed and returns to the usual operation.
Do not use the forced test run for cases other than the test run because it applies excessive load to the
035-000051-001
4. Push the [
ON/OFF ] button to start the test mode.
The screen (1) shown in the left appears. (The screen
(2) appears when the operation is stops.)
Perform the test mode in the "Cool" or "Heat" mode.
5. When test mode is finished, push the [
[
] button to select "1. Test mode" on the "Field
setting menu" screen, then push the "Set" [
ton. The screen (3) appears.
Pushing the "Yes" [
mode screen and continues the normal operation.
CAUTION
devices.
Page 39 of 60
]
F2 ] but-
F1 ] button stops the test
MMD IOM 1.2 11-10-2020