NuAire S2E Series Installation Manual

NuAire S2E Series Installation Manual

In-line extract fans for internal use

Advertisement

1.0 SAFETY INFORMATION
The provision of the electrical supply and the connection of the unit to the electrical supply
must be carried out by a qualified electrician in accordance with latest edition of the wiring
regulations.
Isolate from power supply before removing any covers. During installation / maintenance ensure
all covers are fitted before switching on the mains supply.
All-pole disconnection from the mains as shown in the wiring diagram must be incorporated
within the fixed wiring and shall have a minimum contact separation of 3mm in accordance with
latest edition of the wiring regulations.
This unit must be earthed.
Ducting must be securely fixed with screws to the spigot to prevent access to live parts. Duct
runs terminating close to the fan must be adequately protected by suitable guards.
If the supply cord is damaged, it must be replaced by the manufacturer, its service agent or
similarly qualified persons in order to avoid a hazard. The replacement cord must be of the same
technical specification as the original cord or greater.
This appliance should not be used by children or persons with reduced physical, sensory or
mental capabilities or lack of experience and knowledge, unless they have been given supervision
or instruction concerning the safe use of the appliance by a person responsible for their safety.
Children shall not play with the appliance. Cleaning and user maintenance shall not be carried
out by children.
1.1 Symbols
GENERAL WARNING
Signifies a general warning regarding hazard specified by supplementary information.
ELECTRIC SHOCK
This unit must be completely electrically isolated before any panels are removed. Check
mains supply and control connections.
ROTATING PARTS
This unit contains fast moving rotational parts which may start automatically. It is the
sole responsibility of the installer to adequately guard these components.
REFER TO INSTRUCTION MANUAL
Read and understand the installation and maintenance manual before installing,
operating or maintaining this product.
Nuaire |
Western Industrial Estate
S2E
In-Line Extract Fans For Internal Use
Installation Manual
|
|
| nuaire.co.uk
Caerphilly
CF83 1NA
07. 01. 21. Document Number 671964
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S2E Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for NuAire S2E Series

  • Page 1 REFER TO INSTRUCTION MANUAL Read and understand the installation and maintenance manual before installing, operating or maintaining this product. Nuaire | | nuaire.co.uk 07. 01. 21. Document Number 671964 Western Industrial Estate...
  • Page 2: Personal Protective Equipment

    •VDE Compliant Screwdriver - when adjusting speed control Nuaire would always recommend a site specific risk assessment by a competent person to determine if any additional PPE is required. 2.0 INTRODUCTION The S2E range of in-line backward curved extraction fans consists of 4 units.
  • Page 3: Top View

    Top View CENTRE OF UNIT AIRFLOW Comissioning Panel Unit Dimensions (mm) Unit Unit Weight Code (Kg) S2E-125 149.5 S2E-150 149.5 S2E-200 169.5 S2E-250 204.5 13.1 Nuaire | | nuaire.co.uk 07. 01. 21. Document Number 671964 Western Industrial Estate Caerphilly CF83 1NA...
  • Page 4: Electrical Installation

    PCB to gain access to the terminal connections. Access the PCB following Section 4.3.1 and refer to S2E-SPCON2 instructions for connection information. Nuaire | | nuaire.co.uk 07. 01. 21. Document Number 671964 Western Industrial Estate...
  • Page 5: Annual Maintenance

    Control & Run-on Timer Trickle 061159 Removable Lid Ensure that Nuaire product is made safe from any electrical / water (Access From / refrigerant supplies before dismantling commences. This work Below Required) should only be undertaken by a qualified person in accordance with local authority regulations and guidelines, taking into account all 5.1 Remote Speed Control Commissioning (S2E-SPCON2)
  • Page 6 Technical or commercial considerations may, from time to time, make it necessary to alter the design, performance and dimensions of equipment and the right is reserved to make such changes without prior notice. Nuaire | | nuaire.co.uk 07. 01. 21. Document Number 671964 Western Industrial Estate...
  • Page 7: Commissioning Requirements

    GENERAL the equipment panels or by fixed installation detail (e.g. ducting), then guarding to the appropriate standard The equipment referred to in this Declaration of Incorporation is supplied by Nuaire to be assembled into a must be fitted. ventilation system which may or may not include additional components.
  • Page 8 Where access to any part of equipment which moves, or can become electrically live are not prevented by The equipment referred to in this Declaration of Incorporation is supplied by Nuaire to be assembled into a the equipment panels or by fixed installation detail (e.g. ducting), then guarding to the appropriate standard ventilation system which may or may not include additional components.

This manual is also suitable for:

S2e-150S2e-125S2e-200S2e-250

Table of Contents