System Maintenance; Preliminary Checks - GE LOGIQ e R4 Series Basic Service Manual

Table of Contents

Advertisement

GE
Direction 5370626-100, Revision 18
Section 10-5

System Maintenance

10-5-1

Preliminary Checks

The preliminary checks take about 15 minutes to perform. Refer to the system user documentation
whenever necessary.
Table 10-4
Step
1
2
3
4
5
6
System Checks
Item
Ask & Listen
Ask the customer if they have any problems or questions about the equipment.
Fill in the top of the Ultrasound Inspection Certificate (see page 19). Note all probes and system
Paperwork
options.
With AC input.
Turn the system power on and verify that all fans and peripherals turn on. Watch the displays during
Power up
power up to verify that no warning or error messages are displayed.
Check the Battery recharging.
Without AC input, use internal battery.
Probes
Verify that the system properly recognizes all probes.
Displays
Verify proper display on the LCD.
Presets
Backup all customer presets on an DVD-RW.
Chapter 10 Care & Maintenance
LOGIQ e/LOGIQ e Vet/LOGIQ i/Vivid e Basic Service Manual
Description
10-5

Advertisement

Table of Contents
loading

Table of Contents