Download Print this page

Cisco 6000 Series Hardware Installation Manual page 30

Network convergence system
Hide thumbs Also See for 6000 Series:

Advertisement

Installing the Front Exterior Cosmetics
Attach the left and right vertical cable troughs to the front of the chassis
Step 2
cable troughs are inverted from each other. For each vertical cable trough:
a.
Align the guide pins on the rear of the vertical cable trough with the positioning holes on the front
of the chassis
b.
Loosely insert eight pan-head screws, and then use the screwdriver to tighten them clockwise to
attach the vertical cable troughs firmly to the front of chassis. You might need to use a ladder to
reach the upper screws.
Note
Figure 3-4
1 Vertical cable trough
2 Guide pin
Attach the front cable management brackets
Step 3
Attach the upper horizontal bracket (above the LC cage) by inserting and tightening four pan-head
a.
screws.
Attach the lower horizontal brackets (below the LC cage) by inserting and tightening five pan-head
b.
screws.
Attach the front door alignment bracket to the chassis above the craft display panel by inserting and
Step 4
tightening two pan-head screws along with tightening the captive screw
Attach the door hinge attachments, three left and three right, using two pan-head screws each
Step 5
(Figure
Cisco Network Convergence System 6000 Series Routers Hardware Installation Guide
3-6
(Figure
3-4).
We recommend that you use two people to attach the vertical cable troughs; one person to hold
the vertical cable troughs in place while the other person inserts and tightens the screws.
Vertical Trough with Guide Pins
3-5).
Chapter 3
(Figure
3-3).
Installing the Exterior Cosmetics
(Figure
3-3). The two vertical
1
2
(Figure
3-3).
OL-29234-02

Advertisement

loading