128
A.1 Environmental Requirements
A.2 Installation Steps
A.3 Specifications
A.3.1 Dimensions and Weight
This chapter lists the software installation steps, includes specifications for the Color
Controller C-80 operating environment, and provides a list of the international safety
standards to which the Color Controller C-80 conforms.
•
Software installation—time: approximately 30 minutes
•
Full installation, operating and software—time: approximately 1.5 hours
•
System loading—time: approximately 15 minutes
Color Controller C-80 D x W x H (cm)
Unpacked
Packed
WARNING:
•
The Color Controller C-80 is heavy, and must be lifted by two people.
•
Each person must place both hands underneath the Color Controller C-80
from the sides.
Spectrophotometer
(i1)
[Optional]
Unpacked
Packed
Monitor 19''
Unpacked
Packed
Appendix A—Specifications and Standards
D x W x H (in.)
58.8 × 20 × 44
23.1 ×7.9 ×17.3
63 × 78.5 × 46
24.8 × 30.9 × 18.1 33.1 kg/72.9 lb.
D x W x H (cm)
D x W x H (in.)
10 × 4 × 5
4 ×1 × 2
46 × 35 × 16
18 × 14 × 6
D x W x H (cm)
D x W x H (in.)
44 x 19 x 38
17 x 7 x 15
51 x 35 x 11
20 x 18 x 4
Weight
16.8 kg/37 lb.
Weight
0.8 kg/1.8 lb.
3.0 kg/6.6 lb.
Weight
4 kg/8.8 lb.
4 kg/8.8 lb.
Need help?
Do you have a question about the Color Controller C-80 and is the answer not in the manual?
Questions and answers