Making The Ppp Connection; Figure 31 Cli Console; Figure 32Enabling Hardware Control - Murata Cat-M1/Nb-Iot User Manual

Lte evk
Table of Contents

Figure 31 CLI Console

8.4 Making the PPP connection

1. Open PuTTY on AT port, enter 'at&k3' to enable HW flow control, and then close PuTTY.

Figure 32Enabling hardware control

Copyright © Murata Manufacturing Co., Ltd. All rights reserved. 2018
Type 1SC EVK User Guide, v1.3, 5/4/2020
Page 28 of 44
www.murata.com

Hide quick links:

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Cat-M1/NB-IoT and is the answer not in the manual?

Table of Contents