120/208/230v 1 PHASE SERVICE
CONNECT TO WIRE NUTS
SERVICE
GROUND
BOND
Secure the supply power cable with the two strain relief clamps at the back of the
electrical box and the back of the base.
CONNECT DIRECTLY TO TERMIAL BLOCK
SERVICE L1
SERVICE L2
SERVICE
GROUND
BOND
208/240/400v 6000W WIRING
INSTRUCTIONS
31
Figure 4-7
208/230v 3 PHASE SERVICE
1 2 3 4 5 6 7 8 9
SERVICE PHASE 1
SERVICE PHASE 2
SERVICE NEUTRAL
AS REQUIRED
12 13
10 11
SERVICE PHASE 3