5-3.
Video/Reference Signal System Adjustment
5-3-1.
27 MHz VCO Free-Running Adjustment
Preparation
• Disconnect the cable from the REFERENCE INPUT connector on the rear panel.
• Connect the measuring equipment as shown in the figure.
• Start this adjustment after 10 minutes have elapsed from power-on.
CH2
Probe
IN
Oscilloscope
Adjustment
Equipment: Frequency counter and oscilloscope
Test Point: TP301 (C-6) / DM-152 board
Adjusting Point: MAINTENANCE menu (M06) → 27M CLK TRIM
Tip
CCU MENU → MAINTENANCE → M06: ADC ADJUST
Specification: 27,000,000 ±50 Hz
1
2
3
4
5
6
TP301
A
B
C
D
DM-152 board (Side A)
Setting after Adjustment
After this adjustment is completed, reconnect the disconnected cable.
5-3-2.
STAIR CASE Adjustment
Precautions
This adjustment is used tentatively when a repair is made.
This adjustment must be made again according to the waveform monitor characteristics at the system setup.
HXCU-TX70
CH2
IN
OUT
Frequency
counter
E
F
G
5-5