FB2100/FB2200 Flow Computer 30W Solar Panel Field Replacement Guide
D301824X012
November 2020
5.
6.
4
1
Junction Box controller
2
Knock-outs
3
Lock nut
Use the solar controller lock nut to attach the solar controller to the junction box and use a
7/32" flat head screwdriver to attach the wires from the controller to the junction box
connectors as shown.
Route the BATT+ and BATT– wires from the flow computer into the junction box.