This user's guide describes the characteristics, operation, and use of the ADS1259EVM, both by itself and
as part of the ADS1259EVM-PDK. This evaluation model (EVM) is an evaluation board for two different
devices. First, it can be used to evaluate the ADS1259, a low-noise, 24-bit, single-channel, delta-sigma
(ΔΣ) analog-to-digital converter (ADC). The ADS1259 can be used either in standalone applications or
with the PGA280. The PGA280 is a high-precision instrumentation amplifier with digitally-controllable gain
and signal integrity test capability. The combination of these two devices forms a high-resolution
measurement system able to digitize a wide range of signals.
This EVM allows performance evaluations of both the ADS1259 and the PGA280. The EVM also allows
for PGA280 control of the ADS1259 through the use of the external chip select modes. Complete circuit
descriptions, schematic diagrams, printed circuit board (PCB) layouts, and bill of material are included in
this document.
The following related documents are available through the Texas Instruments web site at
http://www.ti.com.
ADCPro is a trademark of Texas Instruments.
Microsoft, Windows are registered trademarks of Microsoft Corporation.
SPI is a trademark of Motorola Inc.
2
I
C is a trademark of NXP Semiconductors.
NI-VISA is a trademark of National Instruments.
All other trademarks are the property of their respective owners.
SBAU163A – March 2010 – Revised April 2010
Submit Documentation Feedback
ADS1259EVM, ADS1259EVM-PDK
ADS1259EVM (Left) and ADS1259EVM-PDK (Right)
Related Documents
Device
ADS1259
PGA280
REF5025
SN74LVC2G157
Copyright © 2010, Texas Instruments Incorporated
SBAU163A – March 2010 – Revised April 2010
Literature Number
SBAS424A
SBOS487A
SBOS410C
SCES207K
ADS1259EVM, ADS1259EVM-PDK
User's Guide
1
Need help?
Do you have a question about the ADS1259EVM and is the answer not in the manual?
Questions and answers