Download Print this page

Safety Warnings For Handling And Installation - MAILLIS SIAT BeeWrap Installation Manual

Semiautomatic pallet wrapping robot

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 17

Safety Warnings for Handling and Installation

– The manufacturer has attached special attention to the packaging of the ma-
chine, to minimise the risks associated with the shipping, handling and transport
phases.
– The personnel authorised to handle the machine (loading and unloading) must
have acknowledged technical skills and professional ability.
– Before handling, please read the instructions, in particular those on safety, con-
tained in the installation manual, on the packages and/or on the removed parts.
– In order to make transport easier, the equipment can be shipped with a few dis-
assembled and properly protected and packaged components.
– Loading and transport must be carried out with equipment of adequate capacity
by anchoring it to specific points indicated on the packages.
– DO NOT attempt to by-pass the instructions concerning the lifting requirements
and special points provided for lifting and handling each item and/or disassem-
bled part.
– Slowly lift the pack to the minimum necessary height and move it very carefully in
order to avoid dangerous vibrations.
– The packs being shipped must be properly fastened to the means of transport in
order to ensure safe conditions during transfer and the integrity of their contents.
– Certain steps might request one or more operators, who must be previously
trained and informed on the tasks they will have to perform.
– Download packages in the immediate vicinity of the machine setting, which must
be sheltered from bad weather.
– Do not stack the packs onto each other in order to avoid any damage and to avoid
the risk of sudden and dangerous movements.
– In case of prolonged storage, regularly check that the component stocking condi-
tions do not change.
– The installation area is to be prepared so as to be able to carry out the operations
as specified in the manuals and in conditions of safety.
– Ensure that the installation environment is protected against atmospheric agents,
free of corrosive substances and free of any risk of explosion and/or fire.
– Make sure that the installation area has a suitable ventilation to avoid the concen-
tration of unhealthy air for the Operators.
– Signal and delimit the installation area in a proper way in order to prevent non
authorised personnel from accessing the installation area.
– The connections to the power sources (electric, pneumatic, etc.) must be per-
formed correctly, as shown in the diagrams and in compliance with the regulatory
and legal requirements in force.
– ONLY qualified and experienced personnel are allowed to carry out the electrical
connections.
– After completing the connections, perform a general check to ensure that all the
interventions have been carried out properly and that the requirements have
been met.
– The installation manager, before commissioning, must check that all the safety
devices are properly installed and functioning.
– At the end of operations check that there are no other tools or other material near
Installation manual
Transport and handling
English language
5

Advertisement

loading

Related Products for MAILLIS SIAT BeeWrap