Mitsubishi Electric Hydrobox EHSC Series Installation Manual page 8

Table of Contents

Advertisement

3
Technical Information
<EHS*> (Split model system)
H
48
86
124
153
en
163
213
310
<View from below>
<E*SE> (Heating/Heating and cooling system)
600
A
A
REFRIDGERANT
(LIQUID 3/8)
REFRIDGERANT(GAS)
*REFER TO DETAIL VIEW A.
<Front>
I
(ONLY HEATING AND COOLING SYSTEM)
H
H
48
86
124
163
187
249
300
367
492
541
<View from below>
7
B
A
G
C
D
395
461
AUTO AIR VENT
FRONT PANEL
EARTH LEAKAGE BREAKER
TERMINAL BED
MAIN CONTROLLER
MANOMETER
SPACE HEATING FLOW
(ISO 228-1 G1-1/2-B)
SPACE HEATING RETURN
(ISO 228-1 G1-1/2-B)
A
A
B
B
G
G
D
D
C
C
<ERS*> (Split model system for heating and cooling)
A
B
PRESSURE
RELIEF VALVE
G1/2
(242)
<Side>
DEATIL VIEW A
ADD AN ACCESSORY TO
REFRIDGERANT GAS
PIPE. (FRANGE) 3/4F
REFRIDGERANT (GAS)
CONNECTION (BRAZING)
I.D. ϕ 25.4
H
48
I
C
D
86
124
133
163
223
308
365
461
<View from below>
BACK PANEL SUPPORT
G
HOOK
<Rear>

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents