Checking Electrical Connections; Connecting To A Hob Or Cooker Point - Zanussi ZHQ 575 Instruction Booklet

Zanussi built-in electric double oven and grill instruction booklet model number: zhq 575
Hide thumbs Also See for ZHQ 575:
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS

CHECKING ELECTRICAL CONNECTIONS

·
Confirm the appliance is correctly connected by
switching on and observing the various oven
functions indicators.
·
The electronic timer will flash on and off.
CONNECTING TO A HOB OR COOKER
POINT
·
Either follow in general terms the instructions for
connecting to the terminal block or refer to the
hob suppliers installation instructions.
Feed the cable through the cabinet and
arrange to route the cable away from the
appliance.
NOTE: HOUSE CIRCUIT
Earth leakage / continuity tests must be carried out
before the appliance is connected to the mains
supply and re-checked after fitting.
NOTES
57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents