BREWING CONTROL PANEL Autotune your HLT PID An ‘Autotune’ needs to be performed prior to your first brew day. The PID will calibrate itself to give the most efficient and accurate heating. You only need to do this for your PID before your first brew and then it’ll be set.
KETTLE ITEM DESCRIPTION MNPT x QC Fitting 3pc Ball Valve 5/8” Quick Connect Fitting Side Pickup Tube PRO TIPS: Heating Element • All threaded NPT fittings require pipe tape for a leak free seal. You’ll want to put 3-4 wraps of pipe tape on the threads in a clockwise direction. If your 1.5”...
WORT CHILLER ITEM DESCRIPTION Quick Connect Fitting - MQC x MNPT Hose Barb Hex Nipple PRO TIP: T-Fitting • If you have high ground water temps we recommend submerging Temperature Probe your chiller in an ice water bath for the last leg of chilling.
PUMP PRO TIP: • The pump can be rotated in 90° increments as needed. To rotate the pump head, remove the four screws, rotate the head, then tighten the screws. ITEM DESCRIPTION FNPT x QC Fitting 3pc Ball Valve Pump Pump Head Screws...
Page 8
HOSES (2) 4’ (1) 2’ ITEM DESCRIPTION FQC x Barb PRO TIP: Hose - 4’ • To avoid needing hose clamps, we use oversized barbs so the silicon tubing Mash Tun Recirculation Hose - 2’ will be securely attached and creates a full port which doesn’t restrict flow.
Need help?
Do you have a question about the Solo and is the answer not in the manual?
Questions and answers