Preparation Before Test Run; Preparing Data Before Test Run; Setup Before Smart Manager Test Run - Toshiba Smart Manager Engineering Book

Hide thumbs Also See for Smart Manager:
Table of Contents

Advertisement

Smart Manager
6

Preparation before Test Run

Prepare the following data before test run.

6-1. Preparing data before test run

1
Piping diagram, Wiring diagram (including air conditioner, Smart Manager, optional device, and
locally procured product)
2
Air conditioner address information (central address, refrigerant line address, indoor address,
group address)
3
IP address of Smart Manager
4
Floor, tenant, area, air conditioner name displayed on the Web browser
5
Check the specifications of the power meter. Pulse constant
6
Check the specifications of the external input/output signals. Signal logic
7
Prepare for creating setting file data
For the data format, refer to the template sheets.
*1 If connecting from the Web browser
*2 If power is distributed using Energy Monitoring Relay Interface
*3 If external input/output signals are sent using Digital Input/Output Relay Interface

6-2. Setup before Smart Manager test run

1
Finish test run of the air conditioners.
2
Set the central addresses on the air conditioners.
3
Create an address sheet based on the set central address and installation location.
If the operation on the Web browser and power distribution are not performed, proceed to Chapter 8.