Smart Manager
6
Preparation before Test Run
Prepare the following data before test run.
6-1. Preparing data before test run
1
Piping diagram, Wiring diagram (including air conditioner, Smart Manager, optional device, and
locally procured product)
2
Air conditioner address information (central address, refrigerant line address, indoor address,
group address)
3
IP address of Smart Manager
4
Floor, tenant, area, air conditioner name displayed on the Web browser
5
Check the specifications of the power meter. Pulse constant
6
Check the specifications of the external input/output signals. Signal logic
7
Prepare for creating setting file data
For the data format, refer to the template sheets.
*1 If connecting from the Web browser
*2 If power is distributed using Energy Monitoring Relay Interface
*3 If external input/output signals are sent using Digital Input/Output Relay Interface
6-2. Setup before Smart Manager test run
1
Finish test run of the air conditioners.
2
Set the central addresses on the air conditioners.
3
Create an address sheet based on the set central address and installation location.
If the operation on the Web browser and power distribution are not performed, proceed to Chapter 8.
-EN
47
(*1)
(*1)
Engineering Book
(*1)
(*2)
(*3)