Location; Rigging And Handling; Predator ® Component Location; Unit Voltage Limitations - York PREDATOR DM090 Installation Manual

Single package air conditioners and single package electric units 7-1/2 to 12-1/2 ton (380v, 3 phase, 60 hz)
Hide thumbs Also See for PREDATOR DM090:
Table of Contents

Advertisement

035-17311-003-A-0704
Terminal block for
hi-voltage connection
Second model name-
plate inside hinged
access panel
Dual stage
cooling for
max. comfort
Compressor #2
access (high-
efficiency com-
pressor with
crankcase heater
Base rails w/fork-
lift slots (3 sides)
and lifting holes)
Tool-less door
latch
FIGURE 4 -
PREDATOR
TABLE 1: UNIT VOLTAGE LIMITATIONS
Power Rating
380
TABLE 2: UNIT TEMPERATURE LIMITATIONS
Temperature
Wet Bulb Temperature (°F) of Air on
Evaporator Coil
Dry Bulb Temperature (°F) of Air on
Condenser Coil
*.
A low ambient accessory is available for operation
down to -20°F.

LOCATION

Use the following guidelines to select a suitable location for
these units:
1.
Unit is designed for outdoor installation only.
2.
Condenser coils must have an unlimited supply of air.
Where a choice of location is possible, position the unit
on either north or east side of building.
3.
Suitable for mounting on roof curb.
Unitary Products Group
Simplicity™ Control board
w/screw connector
Disconnect location
for T-stat wiring and
(optional disconnect switch)
network connection
Side entry power
and control wiring
knockouts
®
COMPONENT LOCATION
Minimum
Maximum
350
418
Min.
Max.
57
*
125
0
Filter access (2" throw-away)
Roof curbs in eight- and fourteen-inch
heights. Roof curbs for transitioning from
York Sunline™ footprint to the DM
Series footprint are also available
(field-installed accessory)
4.
For ground level installation, use a level concrete slab
with a minimum thickness of 4 inches. The length and
width should be at least 6 inches greater than the unit
base rails. Do not tie slab to the building foundation.
5.
Roof structures must be able to support the weight of the
unit and its options/accessories. Unit must be installed
on a solid, level roof curb or appropriate angle iron
frame.
6.
Maintain level tolerance to 1/2" across the entire width
and length of unit.
72

RIGGING AND HANDLING

Exercise care when moving the unit. Do not remove any
packaging until the unit is near the place of installation. Rig
the unit by attaching chain or cable slings to the lifting holes
provided in the base rails. Spreader bars, whose length
exceeds the largest dimension across the unit, MUST be
used across the top of the unit.
If a unit is to be installed on a roof curb other than a
YORK roof curb, gasketing must be applied to all
surfaces that come in contact with the unit under-
side.
Filter drier (solid
core)
Condenser
section
Belt-drive
blower motor
Slideout motor
& blower
assembly for
easy access
adjustment &
service
Compressor #1 access (high-
efficiency compressor w/
crankcase heater))
Slide-out drain pan
with steel 3/4" FPT
connection
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Predator dm120Predator dm150

Table of Contents