Download Print this page

Asus Aaeon UP Core AL Assembly Instruction Manual page 8

Advertisement

6. Fasten the UP Core Board to the top cover with the hex standoffs through the thread nuts.
7. Place the bottom base on the middle base and fasten it with the M2.5*6 screws.
8
06/02/18
©AAEON Europe BV – Confidential – All Rights Reserved

Advertisement

loading

This manual is also suitable for:

Sop ep-chupcmtvaupc