Ports Test Screen - Motorola LXN 500 Installation, Configuration And Operations Manual

Table of Contents

Advertisement

Click Ports.
3.
Result: The Ports screen is displayed.

Ports Test Screen

Figure 2-17
Click on each of the following port tests to start:
4.
Test USB ports: This test briefly checks the external USB ports of the LXN 500.
1. To perform this test, on the front panel
protective covers of the USB ports (See
2. Plug-in a mass storage flash drive(s) to the USB port.
3. Click Test USB ports.
Result: The LXN 500 exchanges data for 10 seconds with the storage device and indicts
SUCCESS or FAIL.
Test Serial1: This test checks the internal RS232 communication ports that interconnect boards inside the
LXN 500.
Test SSD: This test checks the hard drives of the LXN 500. Click Test SSD and wait for SUCCESS or FAIL
indication.
Test USB (long test): This test extensively checks the USB ports of the LXN 500.
IMPORTANT
1. To perform this test, on the front panel, remove the four screws that hold the protective
panels of the USB ports.
2. Plug-in a FAT32 only flash drive(s) to the USB port.
3. Click Test USB ports.
Result: The LXN 500 exchanges data for one hour with the storage device and indicts
SUCCESS or FAIL.
4. Reinstall the four screws that hold the protective panels of the USB ports.
Send Feedback
This test may last up to one hour and once started cannot be stopped.
, remove the four screws that hold the
of the LXN 500
Figure
1-2).
MN003563A01-B
Operation and Configuration
39

Advertisement

Table of Contents
loading

Table of Contents