Mitsubishi Electric GOT1000 Series Connection Manual page 32

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

1.
PREPARATORY PROCEDURES FOR
MONITORING
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Setting the communication interface
Determine the connection type and channel No. to be used, and
perform the communication setting.
Writing the project data and OS
Write the standard monitor OS, communication driver, option
OS, project data and communication settings onto the GOT.
Verifying the project data and OS
Verify the standard monitor OS, communication driver, option
OS, project data and communication settings are properly
written onto the GOT.
Attaching the communication unit and
connecting the cable
Mount the optional equipment and prepare/connect the
connection cable according to the connection type.
Verifying GOT recognizes connected
equipment
Verify the GOT recognizes controllers on [Communication
Settings] of the Utility.
Verifying the GOT is monitoring normally
Verify the GOT is monitoring normally using Utility, etc.
1 - 2
1. PREPARATORY PROCEDURES FOR MONITORING
1.1
Setting the Communication Interface
Each chapter GOT Side Settings
1.2.1 Writing the project data and OS onto the GOT
1.2.2 Checking the project data and OS writing on GOT
1.3
Option Devices for the Respective Connection
1.4
Connection Cables for the Respective Connection
Each chapter System Configuration
Each chapter Connection Diagram
1.5
Verifying GOT Recognizes Connected Equipment
1.6
Checking for Normal Monitoring

Advertisement

Table of Contents
loading

Table of Contents