1
In the case of Cylinder unit
2
In the case of Cylinder unit
After hand tighten the nut, tighten the joint 1 turn.
If necessary, tighten by another 1/4 of a turn.
4
Pipe cover
(Local supply)
Tightening torque: 42N·m
Use double spanners.
Do not use the fl exible hose below the bend radius of 150 mm.
Ensure that the 2 zone kit
does not touch the pressure
relief valve.
Remove the screw from
the 2 zone kit and reuse to
secure
.