Motoalliance Impact Trailer 100 Manual

Advertisement

Note Slanted Portion of Trailer Tub Face Towards the Rear
UPC
MODEL #
Impact Trailer 100
DESCRIPTION:
MOTOALLIANCE - WWW.MOTOALLIANCE.COM - (866)527-7637

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Impact Trailer 100 and is the answer not in the manual?

Questions and answers

Summary of Contents for Motoalliance Impact Trailer 100

  • Page 1 Note Slanted Portion of Trailer Tub Face Towards the Rear MODEL # Impact Trailer 100 DESCRIPTION: MOTOALLIANCE - WWW.MOTOALLIANCE.COM - (866)527-7637...
  • Page 2 1" Flat Washer 1/8" Regular FW 1 Thickness 5/8" Dia. Bent Hitch Pin / 625 Hitch Pin Snap Clip Tire Wheel Kit - 18" x 8.50" x ITA131 8.00" With 1" ID Bearing MODEL # DESCRIPTION: MOTOALLIANCE - WWW.MOTOALLIANCE.COM - (866)527-7637...
  • Page 3 Place Trailer Tub on Flat Surface Open Face Down. Note: Prior to Final Assembly of Tub onto Frame It will be required to drill (4) 9/16" dia. holes in the poly tub indicated by indents in bottom. MODEL # DESCRIPTION: MOTOALLIANCE - WWW.MOTOALLIANCE.COM - (866)527-7637 Impact Trailer 100...
  • Page 4 It will be required to drill (4) 9/16" dia. holes in the poly tub indicated by indents in bottom. See next page for Tipper Latch Assembly Instructions DETAIL I SCALE 1 : 2 MODEL # Impact Trailer 100 DESCRIPTION: MOTOALLIANCE - WWW.MOTOALLIANCE.COM - (866)527-7637...
  • Page 5 Regular LW 0.25 1/4" Lock Washer HNUT 0.2500-20-D-N 1/4-20 Hex Nut This End Secures This End Secures To Tow Vehicle To Trailer Frame Note Direction of this plate during assembly. MODEL # DESCRIPTION: MOTOALLIANCE - WWW.MOTOALLIANCE.COM - (866)527-7637 Trip Latch Assembly...
  • Page 6 5/16-18 holes for proper alignment and fit during assembly Note: While assembling the rail kit, do not fully tighten all hardware until the rail kit is installed onto the poly tub. MODEL # Rail Extension Kit DESCRIPTION: MOTOALLIANCE - WWW.MOTOALLIANCE.COM - (866)527-7637...
  • Page 7 Hole locations to be located at indents in the top surface of the Poly Tub. Once holes have been drilled in plastic tub, and rail kit hardware is installed, then proceed to tighten all hardware. MODEL # Impact Trailer 100 / Rail DESCRIPTION: MOTOALLIANCE - WWW.MOTOALLIANCE.COM - (866)527-7637...

Table of Contents