Note: The [HWHP] tab will appear when an HWHP (CAHV,
CRHV) unit is connected.
On the [HWHP] display, touch the icon(s) of the HWHP
(CAHV, CRHV) unit group(s) to set the schedule.
(2) If different equipment types exist together, a screen to
select an equipment type will appear.
Touch one of the equipment types to set the schedule.
(3) A [Schedule Settings] screen will appear.
To create a schedule for the given block from scratch,
touch [New settings] and touch [OK].
To create a schedule based on the existing setting of
another group, touch [Based on the following group
settings], select the name of the group whose schedule
is to be based on, and touch [OK]. The contents of the
schedule that have been set for the selected group will
appear in the "Contents of Schedule" section on the
screen that will appear next.
WT07992X02
50
[HWHP] tab
HWHP (CAHV, CRHV) unit group icon