  • Page 1 BROCHURE N 10230 B 07 - 2019 Instruction manual...
  • Page 3: Table Of Contents

    CONTENTS 1 - INTRODUCTION ..............................5 2 - SAFETY ADVISE ..............................5 3 - OPERATION LIMITS............................6 4 - UNIT IDENTIFICATION ............................6 5 - TRANSPORT AND HANDLING ........................... 6 5.1 Transport ..............................6 5.2 Discharging of the unit ..........................6 5.3 Centre of gravity coordinates ........................
  • Page 5: Introduction

    1 - INTRODUCTION The SC range are air-cooled condensing units designed for All of the units are tested and checked in the factory. installation outdoors. They can be connected on-site with one The units comply with European Directives: direct expansion exchanger (or two in case of models 200 to 360). ●...
  • Page 6: Operation Limits

    3 - OPERATION LIMITS Temperature conditions Cooling Heating Minimum -6 ºC 40 ºC Refrigerant   For connection with a direct expansion exchanger. Maximum 10 ºC 52 ºC   With control of operation condensation pressure activated Minimum  -10 ºC WB 12 ºC up to -10ºC.
  • Page 7: Centre Of Gravity Coordinates

    5 - TRANSPORTE Y MANIPULACIÓN ● Discharge via forklift truck: Centre of gravity (mm) Weight The unit is designed to be transported safely by using a forklift (kg) truck. The forks of the forklift truck must come in on the side of the unit, ensuring that the centre of gravity of the unit remains within the forks, because a misbalance in the transport may cause the unit to turn over and fall from the forklift truck.
  • Page 8: Positioning And Installation

    6 - POSITIONING AND INSTALLATION 6.1 Choice of location 6.2 Anchorage for silent-blocks When choosing the location, whatever may be the selected SC - 90 to 320 fashion, the following precautions have to be taken into consideration: ● It is mandatory to comply with norm EN 378-3 on Safety and Environmental Requirements.
  • Page 9: Recommended Service Clearance For Commissioning And Maintenance Operations (Mm)

    6 - POSITIONING AND INSTALLATION 6.3 Recommended service clearance for commissioning and maintenance operations (mm) Unit not designed to have overhead obstruction. SC - 90 to 320 SC - 360 to 600 6.4 Sound level These units are designed to work with a low acoustic level. In any case, the following must be taken into account for the design of the installation: the outdoor environment for acoustic radiation, the type of building for the noise transmitted by air, the solid elements for the transmission of vibrations.
  • Page 10: Checking Before Commissioning

    7 - CHECKING BEFORE COMMISSIONING Important: Under no circumstance should the unit be started without having read the brochure completely. 7.1 Electrical connection Installation norms ● The name plate data. ● The wiring diagram included with the unit. Important: All connections in the site are the ●...
  • Page 11 7 - CHECKING BEFORE COMMISSIONING Connection chart with electronic control AVANT / AVANT+ Outdoor unit SC Expansion Mixing exchager device (connected on-site) (optional) Indoor fan power supply Indoor fan thermal protection Supply T probe Power supply Return or ambient T probe (opt.) TCO user terminal Clogged filter detector (opt.) pGD1 maintenance terminal (opt.)
  • Page 12 7 - CHECKING BEFORE COMMISSIONING Connection chart with electronic control CIATrtc (optional) Outdoor unit SC Expansion Mixing exchager device (connected on-site) (optional) Indoor fan power supply Indoor fan thermal protection Supply T probe Power supply Return T probe Clogged filter detector (opt.) pGD1 terminal NTC ambient T probe (std) or Air flow control (opt.)
  • Page 13: Cooling Connections

    7 - CHECKING BEFORE COMMISSIONING 7.2 Cooling connections Once installed the outdoor and indoor units, the cooling links For determining the equivalent length, the pressure must be laid between them. drops in accessories must be taken into account. Cooling Pressure drops in elbows expressed as equivalent lengths 90 100 120 160 180 182 200 240 320 360 420 485 540 600 connections (m):...
  • Page 14: Condensate Drain Connection

    7 - CHECKING BEFORE COMMISSIONING 7.3 Condensate drain connection Pan in underpressure: Models 90 to 320 (coil in U) These units can optionally have an indoor condensate drain pan. ● Besides the above application, water must be suctioned from the pan because of the depression with respect to the motorfan The pan has a drain tube of outer diameter of 22 mm to which a assembly.
  • Page 15: Safety Elements

    8 - SAFETY ELEMENTS Low pressure pressostat Automatic switch in the control circuit When connected to the compressor suction, Magnetothermal switch that protects the operation circuit against it will stop its operation when the pressure continuous surges as well as against high currents of short at that point goes down below the tare value duration (short circuits).
  • Page 16: Commissioning

    9 - COMMISSIONING 9.1 Checks prior to commissioning Control of the refrigerant charge ● It is advisable to make a complete sketch of the installation including the location of the unit and all the components used. Note: it is necessary charge of refrigerant This will be very helpful for maintenance and repairs to the R 410A following the recommendations given in the...
  • Page 17: Possible Problems At Commissioning

    9 - COMMISSIONING ● Verify the absence of any leaks of the refrigerant. In case of The recording of these parameters whilst the unit is running a leak: allows controlling the installation performance and it is the best possible way to avoid breakdowns since the analysis of - Completely drain the refrigerant charge using a specifi...
  • Page 18: Maintenance

    10 - MAINTENANCE The minimal maintenance operations and their periodicity ● Check the oil level and aspect. In case of a colour change, check the oil quality using a contamination test. will be made in accordance with national regulations. ● In the case of the presence of acid, water or metallic particles, All work on the unit’s electrical or refrigerant systems must replace the aff...
  • Page 19: Servicing

    10 - MAINTENANCE on chapter 9. ● Operators shall ensure that the unit is checked for leaks ad minima according to the following frequency: ● Check for corrosion on all metal surfaces (chassis, casing, exchangers, electric cabinet, etc.). • t CO2e < 5 ..not subjected ●...
  • Page 20 10 - MAINTENANCE Dryer fi lter Condensate drain pan ● The fi lter function is the preserve the cooling circuit clean and ● Check that the condensate pan is clean. There should be no without humidity, neutralizing the acids that can be found in stagnant water.
  • Page 21: Control And Analysis Of Breakdowns

    11 - CONTROL AND ANALYSIS OF BREAKDOWNS Symptom Cause Solution Evaporation pressure very high a) Charge excess a) Collect refrigerant in relation with the air inlet b) High air temperature b) Verify overheating c) Compressor suction not air tight c) Verify compressor state and replace d) Cycle reversing valve in middle position d) Check that the valve is not clogged.
  • Page 22: Final Shutdown

    12 - FINAL SHUTDOWN 12.1 Shutting down 12.4 Materials to be recovered for recycling Separate the units from their energy sources, allow them to cool ● Steel then drain them completely. ● Copper ● Aluminium 12.2 Recommendations for disassembly ● Plastics ●...