Download Print this page

IBM 77 Reference Manual page 11

Collator

Advertisement

R E F E R E N C E M A N U A L
-
P
~
-
-
-
7 7 C O L L A T O R
11
9. Check visually for a minimum of
.020"
air gap between
N / C
points with
zeroes in one side of the unit and ones in the other. Reverse zero, one readings
and check other side. If this adjustment cannot be obtained, it is an indication
of lost motion due to wear of the linkage. A check should be made of the parts
affected in any position where this adjustment cannot be obtained and the worn
parts replaced.
Circuit
Breakers
1.
Clean points.
2.
Loosen screws A and align contact points so that full contact area is used.
3. Loosen locknut C and adjust screw B for correct air gap. There are 40
threads per inch on contact screw, giving
.025"
movement for each turn. Air gap of
CB's 1,
2, 3
and 4 is
.025
".
On all others the air gap may vary from .012
"
to .040
"
t o obtain the correct contact duration.
4.
Form a t E so that contact surfaces meet squarely.
5. Loosen screws D and turn cam to obtain proper timing as given on electrical
timing chart supplied with each machine.
L U B R I C A T I O N
The following list indicates the lubricants t o be used a t various points on the
machine.
IBM 6
Feed knife slides
Select magnet armature pivot
Relay armature pivot
Contact roll oil wells
Clutch latch lever pivots
CB cam lever pivots
Select or unit
Pawl pivots
Setup ratchet pivot shaft oil well
clutch knockoff lever pivots
and felt wick
Stop pawl pivots
High speed contact rolls
Studs on differential link and guide
plate (follow with No. i 7 )
Restoring magnet knockoff cam fol-
lower rollers (follow with No. 17)

Advertisement

loading