Installation; Typical Installation Flow Diagram - NEC iPasolink 200 Manual

Hide thumbs Also See for iPasolink 200:
Table of Contents

Advertisement

INSTALLATION

The standard installation is summarized in this section. Included herein is
information on typical installation work flow and guides for IDU installation, ODU
installation, Antenna (ANT) installation, waveguide connection and coaxial cable
connections. The installation flow diagram is shown below.
This product is a part of radio link system, and is intended to be connected with a
external antenna.
This product will be installed and operated by professional.
After installation, the professional person shall make sure that the system shall
comply with the relevant limits for general public exposure specified as basic
restrictions or reference levels in the council Recommendation 1999/519/EC.
Installation
Submission Prohibited
NEC Internal Use Only
Unpacking of IDU
(see para 3.)
IDU Mounting
(see para 4.)
Fig. 1-1 Typical Installation Flow Diagram
1. INSTALLATION
Unpacking of ODU
(see para 3.)
ODU Mounting
(see para 5.)
Cable Termination
(see para 6.)
Wiring and Forming
(see para 7.)
Frame Grounding
(see para 8.)
Waterproof
Protection
(see para 9.)
Antenna
Orientation
(see para 10.)
1-1
NWD-107460-02E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents