2

Preparation of hardware

Table 1: Preparation of the E3G080 'Extinguishing' control module
No.
Component
1
DIP switch 'S3'
Set I-Bus address
2
DIP switch 'S2'
Determine emergency opera-
tion concept
3
Resistors R60/R61
Remove if necessary
4
Connection level
Check
5
Switch 'S1'
5
2
Fire & Security Products
Siemens Building Technologies Group
Preparation
Set according to system documentation
Set according to system documentation
S2-1/2 î OFF = no special function if µP
E3G080 malfunctions
(for details see document
e1260, E3G080)
Activating device 1 is between 16 ... 160Ω
î Remove R60 (71k5)
Activating device 2 is between 16 ... 160Ω
î Remove R61 (71k5)
Check that all peripheral equipment
planned is connected
(according to system documentation)
Set to ON so that when switching on for the
first time, all outputs are blocked
3
1
2
Default ex-works
Address 0
Set to ON
R60/61 inserted
î for activating device
161 ... 320Ω
Set to OFF
4
e1456c