Maytag Amana MEC96 Series Installation Instructions Manual page 16

Two-stage, fsp category iv direct or non direct vent air furnace
Table of Contents

Advertisement

n
-D
V
i
on
irect
ent
nstallations
A minimum of one 90° elbow should be installed on the combus-
tion air intake "coupling" to guard against inadvertent blockage.
Alternate Vent/Flue Location
On upflow models, the alternate vent/flue location is the large
hole directly in line with the induced draft blower outlet. To
use the alternate vent/flue location refer to the following
steps and the "Alternate Vent/Flue Location" figure.
NOTE: In the horizontal left installation position, a means
of condensate collection must be provided to keep vent
pipe condensate from entering the draft inducer housing.
If the vent drain elbow is eliminated from the installation,
an RF000142 kit must be used.
1. Remove the four screws from the vent pipe flange on
top the furnace.
2. Remove the internal elbow and vent pipe
3. Cut 2 1/2" from the flange .
4. Remove plastic plug in line with the inducer outlet
5. Install cut end of the flanged section and connect to
inducer with rubber coupling supplied with furnace.
6. Install screws removed in step 1 securing flange to
cabinet.
Insert flange. Cut 2 ½" long.
R 000142
F
*MEC96/*CEC96 Direct Vent (2-Pipe) and Non-Direct Vent (1-Pipe)
1. Maximum allowable limits listed on individual lengths for inlet and
flue and NOT a combination.
2. Minimum requirement for each vent pipe if five (5) feet in length
and one elbow/tee.
3. Tee used in the vent/flue termination must be included when de-
termining the number of elbows in the piping system.
4. 2 1/2" or 3" diameter pipe can be used in place of 2" diameter
pipe.
Figure 9
5. Increased Clearance Configuration using (2) 45 deg. Long Sweep
elbows should be considered equivalent to one 90 deg. elbow.
6. One 90° elbow should be secured to the combustion air intake
connection.
Vent/Flue Pipe Cuts
T
HE RUBBER ELBOW IS NOT DESIGNED TO SUPPORT A LOAD
RUBBER ELBOW IS MOUNTED EXTERNALLY TO THE FURNACE CABINET
EXTREME CARE MUST BE TAKEN TO ADEQUATELY SUPPORT FIELD
/
SUPPLIED VENT
FLUE PIPING
CAUSING BODILY INJURY OR DEATH DUE TO EXPOSURE TO FLUE GASES
INCLUDING CARBON MONOXIDE
*MEC96/*CEC96 Direct Vent (2 - Pipe) and Non-Direct Vent (1- Pipe)
Maximum Allowable Length of Vent/Flue Pipe
Pipe Size
MODEL
(4)
(in.)
1
*M EC960303AN
2
75
&
*M EC960403AN
3
114
2
75
*M EC960603AN
3
114
*M EC960302BN
2
100
&
*M EC960402BN
3
168
2
50
*M EC960603BN^
3
143
2
60
*M EC960803BN
3
113
2
60
*M EC960804CN
3
120
2
45
*M EC961004CN
3
103
2
45
*M EC961005CN
3
151
*M EC961205DN
3
185
2
100
*CEC960403BN
3
110
2
45
*CEC960603BN
3
110
2
35
*CEC960803BN
3
103
2
45
*CEC961005CN
3
110
^ *MEC960603BN-add 45' of 2" pipe for upflow.
2.5" pipe may be used instead of 2" pipe.
For installations at or above 7,000 altitude use 3" venting
(and combustion air pipe if applicable)
16
Figure 10
WARNING
,
AS DAMAGE CAN RESULT IN LEAKS
(3) (5)
Number of Elbows
2
3
4
5
6
70
65
60
55
50
107
100
93
86
79
70
65
60
55
50
107
100
93
86
79
95
90
85
80
75
161
154
147
140
133
45
40
35
30
25
136
129
122
115
108
55
50
45
40
35
106
99
92
85
78
55
50
45
40
35
113
106
99
92
85
40
35
30
25
20
96
89
82
75
68
40
35
30
25
20
144
137
130
123
116
178
171
164
157
150
95
90
85
80
75
103
96
89
82
75
40
35
30
25
20
103
96
89
82
75
30
25
20
15
10
96
89
82
75
68
40
35
30
25
20
103
96
89
82
75
. W
HEN THE
,
-
,
(6)
7
8
45
40
72
65
45
40
72
65
70
65
126
119
20
15
101
94
30
25
71
64
30
25
78
71
15
10
61
54
15
10
109
102
143
136
70
65
68
61
15
10
68
61
5
NA
61
54
15
10
68
61

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents