Removal Procedure - NEC Express5800 SIGMABLABE User Manual

10gb intelligent l3 switch
Hide thumbs Also See for Express5800 SIGMABLABE:
Table of Contents

Advertisement

IMPORTANT:
NOTE:
Removing Switch Module
Refer to the Blade Enclosure User's Guide for details.
1
Open the ejector of 10Gb Intelligent L3
Switch to unlock.
2
Pull the ejector a little.
The Switch Module works with the Blade Enclosure. The Switch
Module is powered on as soon as it is installed in the powered Blade
Enclosure. Therefore, make sure that the ports connected with the
Switch Module are only the ports of on-board LAN and NIC on the
CPU Blade. Then, install the Switch Module in the Blade Enclosure.
Do not hold the ejector to install the Switch Module in the Blade
Enclosure. Hold the Switch Module itself and insert it into the Switch
Module slot. Inserting the Switch Module with the ejector being held,
the ejector may be damaged or disengaged from the Switch Module.
It may cause the personal injury if the Switch Module drops.
The Switch Module does not have a POWER switch.
The STATUS LED goes on green after the period of about 10
seconds from installing the Switch Module in the powered Blade
Enclosure.
Ejector
(English)
Blad e E nclo sure
59

Advertisement

Table of Contents
loading

This manual is also suitable for:

N8406-051N8406-052N8406-052fN8406-051f

Table of Contents