Hercules Double Peak Star Marquee Instruction Manual

Instant shelter

Advertisement

Quick Links

21.85m(L)x13.85m(W)x6m(H) Star Marquee Instruction Manual
www.herculesgazebo.co.nz
info@herculesgazebo.co.nz
0800 810 910
Double Peak Star Marquee
21.85m(L)x13.85m(W)x6m(H)
INSTRUCTION MANUAL

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Double Peak Star Marquee and is the answer not in the manual?

Questions and answers

Summary of Contents for Hercules Double Peak Star Marquee

  • Page 1 21.85m(L)x13.85m(W)x6m(H) Star Marquee Instruction Manual www.herculesgazebo.co.nz info@herculesgazebo.co.nz 0800 810 910 Double Peak Star Marquee 21.85m(L)x13.85m(W)x6m(H) INSTRUCTION MANUAL...
  • Page 2: Important Notice

    21.85m(L)x13.85m(W)x6m(H) Star Marquee Instruction Manual www.herculesgazebo.co.nz info@herculesgazebo.co.nz 0800 810 910 FOR SAFETY REASONS YOU MUST READ THIS INSTRUCTION CARFULLY BEFORE USE IMPORTANT NOTICE Minimum FOUR adults are required to set up a double-peak star marquee. Ensure area is free from any sharp & overhead objects. The star marquee can only be installed on grasses.
  • Page 3: Conditions Of Warranty

    You should familiarise yourself with the structure including any restriction it may have for your particular use. Should your marquee roof or frame be damaged, please contact a nearest Hercules store for warranty claim or replacement parts purchase (www.herculesgazebo.co.nz/contact-us).
  • Page 4: Package Includes

    21.85m(L)x13.85m(W)x6m(H) Star Marquee Instruction Manual www.herculesgazebo.co.nz info@herculesgazebo.co.nz 0800 810 910 PACKAGE INCLUDES...
  • Page 5: Tools You Will Need

    21.85m(L)x13.85m(W)x6m(H) Star Marquee Instruction Manual www.herculesgazebo.co.nz info@herculesgazebo.co.nz 0800 810 910 TOOLS YOU WILL NEED...
  • Page 6: Lay Out Plan

    21.85m(L)x13.85m(W)x6m(H) Star Marquee Instruction Manual www.herculesgazebo.co.nz info@herculesgazebo.co.nz 0800 810 910 LAY OUT PLAN SIZE LENGTH WIDTH HEIGHT 21.85mx13.85mx6m 5.85 13.85 21.85 13.85 Figure 01: Marquee dimensions...
  • Page 7 21.85m(L)x13.85m(W)x6m(H) Star Marquee Instruction Manual www.herculesgazebo.co.nz info@herculesgazebo.co.nz 0800 810 910 Set up a layout plan according to your marquee dimensions Figure 02: Layout plan – steps of spigot and peg placement...
  • Page 8 21.85m(L)x13.85m(W)x6m(H) Star Marquee Instruction Manual www.herculesgazebo.co.nz info@herculesgazebo.co.nz 0800 810 910 POLE SPIGOT BASE PLACEMENT The pole spigot bases(E) are drilled into the ground by using a sledge hammer, and 5.85.m apart. A small block timber must be used to reduce the likely damage to the spigot top by the hammer.
  • Page 9 21.85m(L)x13.85m(W)x6m(H) Star Marquee Instruction Manual www.herculesgazebo.co.nz info@herculesgazebo.co.nz 0800 810 910 PEG PLACEMENT Start by lifting one spigot base(E1) out of the ground and place back in the ground through one of the template rings. Lay one side of the template along the painted line previously marked, and square out the other template so the template rings are point H1 and H2. Painted mark on the ground through the both the template rings at this point, swing the template over to the other side either the marquee keeping one side template on the original painted line, lay the line on the ground through the blank template ring point H3, remove the spigot base and template, replace the pole spigot base into the hole, repeat these steps to other end of the marquee, starting the other spigot base(E2).
  • Page 10: Pole Assembly

    21.85m(L)x13.85m(W)x6m(H) Star Marquee Instruction Manual www.herculesgazebo.co.nz info@herculesgazebo.co.nz 0800 810 910 POLE ASSEMBLY To build the poles, join section mark A, B, C and D. And ensure the pole extension is fully closed on each process using the winder handle. Place the assembled pole on the ground and repeat these steps to assemble the other pole.
  • Page 11: Marquee Assembly

    21.85m(L)x13.85m(W)x6m(H) Star Marquee Instruction Manual www.herculesgazebo.co.nz info@herculesgazebo.co.nz 0800 810 910 MARQUEE ASSEMBLY Spread out the marquee, and hook each marquee leg into place on top of each corresponding pegs. Ensure the hook on the leg sits between the two washes on the peg. From the same side of the marquee, insert the top of each pole to one of the soaking fitting. Ensure they are fully inserted.
  • Page 12 21.85m(L)x13.85m(W)x6m(H) Star Marquee Instruction Manual www.herculesgazebo.co.nz info@herculesgazebo.co.nz 0800 810 910 MARQUEE DISMANTLING Firstly, take down both poles with the winder handles until it is in fully closed position. The pole being held, release one of the marquee legs from one of the pegs. Lift both poles out of the spigot bases, and walk the poles out of the marquee. Remove all the pegs from the ground using the peg removal tools.

Table of Contents