Cable Assembly - Weider Pro 4950 831.14623.0 User Manual

Weider user manual weight system 831.14623.0
Table of Contents

Advertisement

24. Apply grease to an M10 x 110mm Bolt (93) and
a 90mm Spacer (59). Attach the Left Press Arm
(15) to the Right Press Arm (16) with the Bolt,
the Spacer, and an M10 Nylon Locknut (77).
Finish attaching the Press Arms (15, 16) with
two M10 x 63mm Bolts (79), two M10 Washers
(80), and two M10 Nylon Locknuts (77). Do not
tighten the Nylon Locknuts yet.
Apply grease to an M10 x 110mm Bolt (93) and
a 90mm Spacer (59). Attach the Left and Right
Press Arms (15, 16) to the Right Base (1) with
the Bolt, the Spacer, and an M10 Nylon Locknut
(77). Do not over tighten the Nylon Locknut;
the Press Arms must pivot freely.
Tighten the Nylon Locknuts (77) used in
this step.

Cable Assembly

25. See the CABLE DIAGRAMS on page 32 and
33 to identify the cables as you assemble
them.
Identify the Butterfly Cable (50). Grease an
M8 x 22mm Shoulder Bolt (90). Attach the
Cable to the Left Butterfly Bracket (28) with the
Shoulder Bolt and an M8 Nylon Locknut (78).
Make sure the flat edge of the Cable is
against the Left Butterfly Bracket. Do not
overtighten the Shoulder Bolt; the Cable
must be able to pivot freely.
26. Wrap the Butterfly Cable (50) over a “V”-pulley
(47). Attach the “V”-pulley, a Long Cable Trap
(57), an M10 Washer (80), and two Guards (54)
to the Right Upright (2) with an M10 x 63mm
Bolt (79) and an M10 Nylon Locknut (77).
24
16
Grease
77
59
15
77
93
80
Grease
59
77
79
1
93
Grease
25
Flat Edge
90
Grease
50
78
28
26
77 54
47 57
79
80
54
50
2
Page 16

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pro 4950831.14623.0

Table of Contents