Download Print this page

Mandik FDMR Installation Instructions Manual page 18

Fire damper

Advertisement

≥ 50
Position:
1
Fire damper
2
Solid ceiling construction
3
Stuffing box (mineral stone wool min. density 140 kg/m³)
4
Fire protection mastic min. thickness 1 mm
5
Cement lime plate min. thick. 15 mm min. density 870 kg/m³
6
Duct
≥ 40
*
≥ 25
≥ 25
≤ 300
Screws has to be fixed in wall/ceiling construction.
(If it is needed use steel bracket).
≤ 300
Screw
(min. 4x50)
* min. 110 - Concrete/ min. 125 - Aerated concrete
Used materials - example:*
3
Promapyr, Rockwool Steprock HD, Hilti CFS-CT B 1S 140/50
4
Promastop - P, K, Hilti CFS-CT
5
Promatect - H
** Fire resistant insulation and fire resistant board can be
replaced by another approved fire sealing system for
damper installation with equivalent material properties.
18

Advertisement

loading

This manual is also suitable for:

Fdmr 60