Weber Summit 475 Step-By-Step Manual page 5

Natural gas barbecues
Hide thumbs Also See for Summit 475:
Table of Contents

Advertisement

BUILT-IN SLEEVE GAS
LINE LOCATIONS
Support tubes
BUILT-IN SLEEVE GAS LINE
LOCATIONS
475
A
5.0"
B
10.1"
C
2.5"
The dimensions shown indicate the location of the gas
line inlet flange in the insulated sleeve. The support
members of the built-in structure must not impede
passage of the gas lines.
Area should be kept clear of sharp, jagged, or extremely
abrasive surfaces to avoid possible damage to gas supply
lines. Exercise caution when pulling gas lines through
built-in structure.
Note: Leave an access in the structure for gas supply
and regulator service.
Figure 6
675
Tolerances
+
1
1 6
5.0"
-
1
1 6
+
1
10.1"
1 6
-
1
1 6
+
1
2.5"
3 2
-
1
3 2
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Summit 675Summit 475 ngSummit 675 ng

Table of Contents