Start-Up; General Rules For Handling The Spray Gun; Preparation - WAGNER GA 250AL Operating Manual

Automatic airless spraygun
Hide thumbs Also See for GA 250AL:
Table of Contents

Advertisement

EDITION 07 /2005
OPERATING MANUAL
5.3

START-UP

5.3.1

GENERAL RULES FOR HANDLING THE SPRAY GUN

➞ See SAFETY REGULATIONS in Chapter 2
5.3.2

PREPARATION

Mount the spraygun on the automatic movement system.
Connect material hose to the spraygun and the paint pump.
Select and mount the required nozzle.
Connect the air hose ø6 mm; 0.24 in / ø4 mm; 0.16 in for the control air to the air
connection of the spraygun.
Visually check the permissible pressures for all the system components.
Make sure that the spraying unit and all other conductive parts within the work area
are earthed
Set material pressure approx. 250 bar; 25 MPa; 3626 psi or 400 bar; 40 MPa; 5800 psi
and use a suitable medium (solvent or water) to check that connections do not leak.
Relieve spray gun and unit pressure.
PART NO. DOC0350941
Accessorie Suspension bolt
Part-No. 0350480
GA 250AL_GA 400AL
.
20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ga 400al

Table of Contents