Figure 11. Cell Installation And Flow/Temp/Salinity Sensor - Jandy AquaPure Installation And Operation Manual

Electronic salt water chlorinator, water purification system power center and cell kit
Hide thumbs Also See for AquaPure:
Table of Contents

Advertisement

Page 22
5. Connect the DC cord to the control center. Feed the DC cord through the same strain relief fitting as the
flow/temp/salinity sensor. Plug the DC cord as shown in Figure 2a, 2b, and 2c.
Do not bury the electrolytic cell DC cord or Sensor cable directly in the ground. Direct burial can cause
damage to an electrical cord/cable.
6. Tighten strain relief fitting screws for the flow/temp/salinity sensor cable and the DC cord. Do not pull
flow/temp/salinity sensor cable or DC Cord too tight. Allow a little cable slack inside of control center
enclosure.
7. Check the wiring prior to reattaching front cover. Be sure the flow/temp/salinity sensor is plugged in.
The DC cord should be plugged in. Also, check the AC wiring.
Do not over tighten the strain relief fitting. Over tightening can cause damage to the flow/temp/salinity
sensor cable.
8. If disconnected, plug the ribbon cable into the J1 connectors the user interface and the Power Interface
PCB (See Figures 2a, 2b, 2c, and 10).
Do not operate the electrolytic cell without water circulation. A buildup of flammable gases can result in
FIRE or EXPLOSION.
Sometimes
Not Covered
Salinity
Studs
Flow/Temp/Salinity Sensor Face must
be clean at all times for proper operation
Figure 11.
Cell Installation and Flow/Temp/Salinity Sensor
2" x 2½" or
50mm Union
or
Temperature
Sensors
* Ensure the DC Plug is properly and securely
connected to the terminal studs of the cell.
CAUTION
CAUTION
CAUTION
DC Cord Plug is Connected
to Terminal Studs*
O-Ring
Seal
2 x 2½" or 50mm Tailpiece
with Coupling Nut
Flow/Temp/Salinity Sensor
O-ring and Union Nut

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Purelink

Table of Contents