Download Print this page

Install Handle - Husqvarna CRT51 Instruction Manual

Hide thumbs Also See for CRT51:

Advertisement

2.
Assembly
1.
Gearcase notch
2.
Handle lock
3.
Handle (high position)
4.
Shift lever
5.
Handle (low position)
6. Handle lock lever

Install handle

a. Insert one handle lock (with teeth facing outward) in
gearcase notch (fig. 1). Apply grease on smooth side of
handle lock. This will aid in keeping lock in place until
handle is lowered into postion.
b. Grasp handle assembly, ease han dle base into "up"
position as shown in figure 2. Be sure handle lock remains
in gearcase notch. Be careful not to stretch or kink
cables.
c. Rotate handle assembly down. Insert rear carriage bolt
(fig. 3-inset) first, with head of bolt on L.H. side of tiller.
Insert front pivot bolt. Lower the handle as sem bly.
Tighten bolts so han dle moves with some resistance.
d. Insert second handle lock (with teeth facing inward) in
slot handle base (fig. 3-inset).
e. Place washer on threaded end of handle lock lever.
f. Insert handle lock lever through handle base and gear
case (fig. 3-inset).
g. With handle assembly in lowest position, securely tight
en handle lock lever by rotating clockwise.
7

Advertisement

loading