I N N O V A T I V E S A U N A T E C H N O L O G Y EOS SteamRock II Basic steam generator Installation and operation manual Made in Germany print no. 2902 5140 / 27.20 Subject to technical changes Version 00 | firmware R0.91...
Page 4
Introduction Dear customer Thank you very much for purchasing EOS sauna & steam equipment. You have purchased a mod- ern, technically advanced product which will provide you with years of reliable operation. EOS steam generators have been designed and tested to comply or exceed the currently applica- ble European safety norms and are produced in our factory in accordance with the quality man- agement norms DIN EN ISO 9001:2015.
Tel.: +49 2775 82-0 Fax: +49 2775 82-431 1.2 Copyright The copyright owner of the present installation manual and operating guide is EOS Saunatechnik GmbH. Copyright as per DIN ISO 16016: The copying and distribution of this document, as well as the use and communicatio n of its con- tents without express authorisation, are not permitted.
The SteamRock II Basic requires an external control unit (e.g. EOS Econ S2) which is not included in the scope of delivery. Third party control units may not be used without prior written consent of EOS Saunatechnik GmbH.
2. General safety instructions Safety levels Safety instructions and important operating instructions are classified according to ANSI Z535.6. Please familiarise yourself with the following terms and symbols: DANGER Danger Indicates a hazardous situation which, if not avoided, will result in death. WARNING Warning Indicates a hazardous situation which, if not avoided, could result in death or serious injury.
Page 8
General safety instruction - Mounting and electric installation These installation instructions are intended for qualified personnel familiar with the laws and regulations applicable to electrical installations at the installation site. Observe the following general safety instructions during assembly, setup and commissioning. DANGER Risk to life and limb and risk of fire Risk to life and limb from electric shock and fire in the event of improper or faulty electri-...
Page 9
General safety instruction - Mounting and electric installation WARNING Risk of poisoning from steam Descaler can react with other chemicals, which can create poisonous steam. Place the container for descaler only under the steam generatorand secure it so it • does not tip.
Page 10
General safety instruction - Mounting and electric installation NOTICE Damage to the unit due to high levels of lime Lime deposits clog the vaporiser tank, slowing down the transfer of heat to the water. This can lead to malfunctions because of overheating and blockages in the drain. A water softening system does not replace regular descaling.
Page 11
General safety instruction - Operator Instruction The operator of the steam generator must be instructed in the general safety instructions dur- ing commissioning. The operator must be given a copy of the instructions for use. DANGER Risk of electric shock A risk to life and limb from electric shock and fire arises in the event of improper repair work.
Page 12
General safety instruction - Operator Instruction NOTICE Equipment damage due to overuse In commercial steam rooms, excessive humidity in the spatial surroundings of the steam room(s) can lead to material damage In a commercial steam room, the steam generator must be set so that it turns itself •...
3. Scope of delivery The SteamRock II Basic scope of delivery includes: • SteamRock II Basic steam generator • 4 screws 5 x 40 with 4 dowels F6 for installing the steam generator on the wall • 2-part brass union 1 1/4“ - 35 mm for steam pipe connection •...
3. Specifications Dimensions H x W x D [mm] 670 x 460 x 350 mm Weight [kg] 28 kg (type 1 - 9 kW) / 30 kg (type 2 - 18 kW) Water supply pressure [bar] 2 - 8 bar Operation pressure max.
5. Installation 5.1 Installation example * For installation details of the tem- perature sensor please refer to the installation manual of the respec- tive control unit.
5.2 SteamRock II Basic - position of key components top view example of the 9 kW unit A drain line of the pressure relief valve B pressure relief valve with drain C water supply line D descaler liquid supply hose...
Page 17
Bottom view Status LED for operation states and error signals drain line from pres- sure relief valve water supply, 3/4” ex- ternal thread white hose for descaler (plugs into the container for descaler) steam output, 1 1/4” external thread water tank drain, 1“ external thread mains connection* 9 kW: with pre-mounted cable and CEE-plug 16A...
Page 18
Overview without external housing example of a 18 kW unit pressure relief valve pressure relief valve drain descaler supply hose water tank main terminal bank with colour-coded terminals main board water supply line F-fuses for heating elements 9 kW - F1/F2/F3 18 kW - F1/F2/F3/F4/F5/F6 dual way magnet valve (water supply)
5.3 Installation location requirements The steam generator is only intended for installation outside of steam rooms and is connected to the room via a steam pipe. The following climatic conditions must be met at the installation site: Ambient temperature during operation 5°C to 40°C Air humidity during operation 30% to 75% rel.
Page 20
NOTICE Damage due to inadequate installation site The steam generator may vibrate slightly when the water boils. If the wall bearing capacity is insufficient or the wall is of poor quality, the steam generator cannot be securely installed and may fall off. Before installation, check the quality and bearing capacity of the wall intended for instal- lation.
5.4 Mounting the steam generator The steam generator is mounted on the wall with four (4) retaining screws and suitable anchors. Note that the steam generator may vibrate slightly when the water boils. Ensure that you have sufficient hardware for securing it if you do not use the supplied screws and anchors. Necessary steps: Preparing for installation Loosen the vaporiser from the shipping plate...
Page 22
Loosen the steam generator from the shipping plate 1. CAUTION! Vaporiser and shipping plate weigh approx. 35 kg. Obtain help from a second person.. Lift the steam generator out of the shipping box with the shipping pla- te. Do not pull or hold the device by the plastic housing! 2.
Page 23
Mounting the steam generator 1. CAUTION! Generatlr and back wall of housing weigh approx. 28 kg. Two people are needed to mount the unit. Hang the generator on the pre-mounted screws by inserting the screws that are on the top of the rear of the unit into the keyholes and then allow the steam generator to drop down gently until it catches in place.
5.5 Water and steam pipes NOTICE The connection for the water supply line and drain outlet must comply with the European Union’s current applicable standards DIN 1988/EN 1717 and DIN 1986/EN 12056. It may be necessary to install a check valve. Local regulations must also be observed. •...
Page 25
Positioning the steam pipe correctly Correctly and incorrectly positioned steam pipe • The pipeline for steam emission must be capable of withstanding temperatures up to 110°C. A copper pipe with a diameter of 35 mm is preferable. • The copper pipe must be insulated with material capable of withstanding temperatures up to 110°C, e.g.
Page 26
Connecting the cold water supply line Connect the cold water supply to the 3/4“ water supply line on the base plate of the housing with the supplied hose.. Connecting the water supply Connecting the drain outlet 1 Screw a drain pipe onto the 1“ thread of the drain pipe. Alternately, a hose can also be attached and tightened.
5.6 Mounting the steam pipe Necessary steps • Connecting the steam supply to the housing floor Hardware + tools: • Ø 35 mm pipe, heat-resistant up to 110°C • T-piece: 1 1/4’’ for steam supply, 3/8’’ for essence nozzle • Silicone, heat-resistant up to 110°C •...
Page 28
NOTICE Damage to the steam supply If the injection nozzle for essence is inserted from the side into the vertical pipe or from below into the horizontal pipe, it is possible for essence to dry up before drops of it reach the rising steam. In such instances, a sticky substance can form, which can block the injection nozzle and the pipe.
Page 29
Securing nut Steam pipe Image shows 18 kW version Lay the steam pipe so it descends towards the steam outlet without any sharp 90° bends. Positioning the steam pipe correctly Check the screws in the tubular heating elements and tighten as needed (SW 19). Rotate the steam pipe upwards and lay it in ascending order Cut out the pre-punched opening for the ascending pipe in the housing.
Steam on - control PE - control unit Signal - output Signal - output Fragrance Fragrance PE - Fragrance Terminal diagram for SteamRock II Basic with 18 kW, 400 V connection (3 x 32 A). Anschlussklemmen und Sicherungen für Leistungsanpassung, 18 kW...
Signal - output Fragrance Fragrance PE - Fragrance Terminal diagram for SteamRock II Basic, 9 kW, 400 V connection, with 3 x 16 A fuse. The mains connection is made via the pre- mounted connecting cable with a Cekon-type plug to the corresponding separately secured Connection terminals and power selection switches (9 kW model).
Page 32
6.3 SteamRock II Basic Main circuit diagram and internal wiring SteamRock II Basic 9 kW...
Page 34
6.4 SteamRock II Basic connection to Econ S2 SteamRock II Basic 9,0 kW (3 x 16 A) L1 L2 L3 N N N N N S1 Wb PE N A2 PE (Gr) (Gr) (Gr) Econ S2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Übrige Anschlüsse gemäß...
Page 35
6.5 SteamRock II Basic connection to EmoTouch 3 Sauna, EmoTec H, Econ H SteamRock II Basic 9,0 kW (3 x 16 A) L1 L2 L3 N N N N N S1 Wb PE N A2 (Gr) (Gr) (Gr) Emotec H / EmoTouch 3 / ECON H 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Übrige Anschlüsse gemäß...
6.6 Leakage current The leakage current must not exceed the following values in accordance with DIN EN 60335- 1:2012-10: For stationary class I heating appliances: 0.75 mA or 0.75 mA per kW rated power input of the heating unit, whichever is higher, up to a maximum of 5mA. The electricity supply must be protected by a residual-current-operated protective device (RCD) with a rated fault current of <30 mA.
The approved cleaner is available at EOS as an accessory. The warranty will be void by the use of an unsuitable and unapproved cleaner liquid.
Page 38
7.2 Functioning of the cleaning system The steam generator features an integrated automatic descaling and draining system. This system will automatically descale the water tank at certain intervals. These intervals depend on the evaporated water quantity. They do not depend on the total “switched on” time which may have certain intervals without actual steam production.
8. Adjustment of the performance SteamRock II Basic steam generators have a fast-tuning performance that can be adjusted to the cabin size in a few seconds on-site. The switching capacity is set by means of F-fuses (see Fig. 9) on the main terminal block.
Page 40
Special attention is required for power increase. If you are unsure which power to select, start with a lower setting first. If necessary, contact EOS Customer Service. CAUTION Risk of scalding from excessive humidity and temperature During commissioning, it must be ensured that the set power matches the cabin size and is not able to generate excessive temperatures in the cabin.
The SteamRock II Basic does not have an on / off switch. The device is permanently connected to the mains and is switched on and off by an external control by wiring the inputs WB, S1 and N.
9.1 Resetting the safety temperature limiter (STB) The safety temperature limiter (STB) switches off the heater if the vaporiser tank overheats. To restart the heater, you must press the Reset button. CAUTION Risk of burns from hot parts The steam pipe on the base plate is very hot. Do not touch the steam pipe.
10. Cleaning and servicing The SteamRock II Basic steam generator must be serviced and cleaned regularly. The frequency de- pends on how often it is used. The integrated cleaning and descaling system increases the service life of the steam generator. It does not replace an upstream water softening system, which is re- quired for hard water or if used commercially.
Page 44
Servicing • Check and clean all pipes as needed • Check and clean the drain as needed • Check and replace the pump hose for the descaling pump and essence pump as needed • Visual inspection: Lime scale in the vaporiser tank •...
Page 45
Checking the level sensor Disconnect the connecting cable from the level sensor from the „level sensor“ slot on the main circuit board. Then unscrew the 3 socket screws (A), pull out the plate (B) with seal (C) and level sensor upwards. Check the tip of the rod electrode (D) for calcification.
10.3 Dismantle the vaporiser tank with heating spirals If necessary, the vaporiser tank can be opened as follows: Removing the cover from the vaporiser tank 1. CAUTION! Check if the mains connection has been disconnected and close the water supply. Allow the steam generator to cool for approx.
Page 47
13. Loosen the 6 hexagon socket screws above on the cover. 14. Lift up the cover with the connection parts until the heating coils have been removed completely from the vaporiser tank. 15. Remove lime scale mechanically from the floor and inner walls of the vaporiser tank. Clean the walls with chemicals, as needed.
Page 48
Closing the vaporiser tank Now mount the cover with heating spirals on the container. The assembly takes place in the reverse order. Make sure that the silicone sealing ring fits the mounting holes so that the socket screws can be screwed in. Please also note that the baffle plate (a) at the bottom of the container lid does not bend.
11. Troubleshooting SteamRock II Basic steam generator will display the operation states and common malfunctions by flashing of the main operation LED (pilot lamp) on the bottom housing of the unit. Flashing codes of the status LED: • Off - Steam generator switched off •...
Page 50
Reason: Water filling valve is blocked or faulty. Solution: Clean the valve (e.g. pressurized air) and make sure it is operational. Reason: Water level probe got stuck or is faulty. Solution: Make sure the float of the probe can move freely, clean if necessary and check for functionality (see chapter installation >...
2012/19/EU. Do not dispose it with the normal household waste. Service Address: EOS Saunatechnik GmbH Schneiderstriesch 1 35759 Driedorf, Germany Tel: +49 (0)2775 82-514 Fax: +49 (0)2775 82-431 servicecenter@eos-sauna.de...
The manufacturers General Terms and Conditions of Business, which can be found at www.eos-sauna.com/ V. Liability agb, shall apply in addition to the foregoing terms and conditions of service.
Need help?
Do you have a question about the SteamRock II Basic and is the answer not in the manual?
Questions and answers