CHAPTER 2
HARDWARE PREPARATION AND INSTALLATION INSTRUCTIONS
2.1
INTRODUCTION
This chapter provides unpacking
instructions for the EVM.
instructions, hardware preparation, and installation
B
2.2
UNPACKING INSTRUCTIONS
NOTE
If shipping carton is damaged upon receipt, request carrier's agent
be present during unpacking and inspection of the EVM.
Unpack EVM from shipping carton. Refer to packing list and verify that all items are present.
Save packing material for storing or reshipping the EVM.
2.3
HARDWARE PREPARATION
This portion of text describes the inspection/preparation of EVM components prior to target
system installation. This description will ensure the user that the EVM components are
properly configured for target system operation. The EVM has been factory-tested and is
shipped with factory-installed jumpers.
EVM should be inspected/prepared for jumper placements prior to target system installation.
Figure 2-1 illustrates the EVM connector, switch, indicator, and jumper header locations.
Connectors J1, J3, J4, J9, J18, and P1 facilitate interconnection of external equipment to the
EVM. Switches S1 through S5 provide user control of the EVM. Indicators CR1, CR2, CR7,
and CR8 provide operational status indications of the EPROM MCU programming circuitry.
Refer to Chapter 3 for switch and indicator descriptions.
EVALUATION MODULE USER'S MANUAL
M68705EVM
MOTOROLA
2-1