Husqvarna Rider 213C Workshop Manual page 37

Hide thumbs Also See for Rider 213C:
Table of Contents

Advertisement

To disassemble and
9. Assemble the wheel. See
assemble the wheels on page 18 .
10. Fill the transmission oil tank until the oil is at the
maximum level. The product must be level and the
oil must have a temperature of approximately 20 °C.
Max
Min
To bleed the drive
11. Bleed the hydraulic system. See
system on page 31 .
12. Start the product and do a check for an oil leak from
the new shaft seals.
13. Do a check of the oil level and, if necessary, fill the
transmission oil tank after the test run.
9.5.11 To replace the hydrostat cable
9.5.11.1 To remove the hydrostatic transmission cable
To remove the
1. Remove the frame tunnel cover. See
covers on page 17 .
2. Loosen the cable locknut for the front hydrostatic
transmission ¼ turn and remove the locking spring.
A
B
3. Remove the cable clamp for the front hydrostatic
transmission that is attached below the tunnel cover.
To remove the
4. Remove the transmission cover. See
covers on page 17 .
5. Remove the locking spring and the ball joint on the
rear hydrostatic transmission cable from the arm.
Remove the rear clamp.
6. Lift off the front ball joint and pull out the cable.
7. Lift out the hydrostatic transmission cable and the
ball joint.
8. Loosen the two ball joints from the hydrostatic
transmission cable.
9. Pull out the hydrostatic transmission cable.
Repair instructions - 37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rider 214tRider 216 awd

Table of Contents