Cisco Webex Room Panorama Installation Manual page 18

Hide thumbs Also See for Webex Room Panorama:
Table of Contents

Advertisement

4.3 Insert the power cavities
Hang the two power cavities between the risers as shown. They are equal. The
top of the cavities aligns with the rack cavity.
×2
16
4.4 Insert the display cavities
Hang the two display cavities between the risers as shown. They are equal. The
display cavities are higher than the others. The
aligns with the other cavities.
×2
bottom
of the display cavities