Chapter 3 Preparations for Operation (Hardware)
3
24
The following flowchart shows the flow of DN611 setting.
Start
Setting DN611 node address,
operation mode,
communication rate
Mounting the DN611 in the G2
bus I/O slot in the S controller
Connecting the DN611 to the
network
Supplying network power
Switching the S controller on
End
Figure 3-1 DN611 Hardware Setting Flowchart
Set them with the DIP switches on the front panel
and the rotary switches on the bottom.
For details, see 3.2 Setting the Switches.
Mount the DN611 in the G22 bus I/O slot in the
base unit of the S controller. For details, see the
description of module mounting in the Sequence
Controller S2 User's Manual.
Connect the DeviceNet cables to the DN611 using
the network connector (supplied with the DN611).
For details, see 3.4 Connection to the Network.
Supply the communication power for the DeviceNet
devices through the network cables. For details,
see 3.5 Network Power/Grounding.
After completing the above steps, switch the S
controller on. For details on power cabling and
grounding procedures, see the descriptions of
grounding and power cabling procedures in the
Sequence Controller S2 User's Manual.
model 2000 DeviceNet Module Manual (DN611/DN611A)