9. Install a lithium battery onto the wall.
11
Installing Cables
Route inter-device cables through the pole.
Installing Ground Cables for Modules
11.1
1. Connect ground cables between the function module and lithium batteries.
function module
Pole ground bar
Installing Cables for the Maintenance Compartment
11.2
Cable Hole Diameter Requirements
10.(Optional) Install the second
lithium battery onto the wall.
Lithium battery
Lithium battery
Cable Hole
No.
Silk Screen
1
GE
2
RS485/FE
3
DI
4
DO
5
12VDC
6
24VAC
8
If two lithium batteries are
required, install them onto two
adjacent wall hanging kits.
2. Connect the other end of the module
ground cable to the pole ground bar.
Module ground cable
Cable Type
PoE network cable, optical fiber
-
-
Dome camera alarm linkage cable
Bullet camera power cable
Dome camera power cable
Cable Outer
Diameter
6.8±0.3 mm
9.3±0.4 mm