P l e a s e R e a d C o m p l e t e l y B e f o r e S t a r t i n g A s s e m b l y
Check Box For These Contents
Trellis Caps (8)
1
Rafter Boards (4)
2
Header Boards (2)
3
Side Panels (2)
4
Metalwork (2)
5
Hardware
3/4" screws (4)
•
4" Screws (8)
•
2 1/2" Screws (28)
•
Arbor Anchor stake kit
•
To o l s Yo u Wi l l N e e d
Phillips Screwdriver
•
Power Drill / Screwdriver
•
Concrete Mix, 60#, (2 bags—optional for anchoring arbor)
•
The Following Items are Handy to Have
Tape Measure
•
Carpenter's Square
•
Stool or Short Ladder
•
P r e l i m i n a r i e s
Your arbor has been submerged in high quality stain to provide lasting beauty. Painting is not required. If you
choose to paint your arbor, we recommend that you do so before assembly, it makes the job easier. Be careful not
to cover up pre-drilled holes or guide marks on top of headers.
Work Area
Select an area close to where the arbor will be installed. This arbor is quite heavy, and may be difficult to move
once assembled. Two people are required to move the assembled arbor.
The assembly area should be relatively flat and open, at least 8'x6'. A lawn, driveway or wide path will be satis-
factory. It is a good idea to lay out the arbor box on your work surface to protect the arbor from nicks and
scratches.
A s s e m b l y I n s t r u c t i o n s
Tuscany Arbor
445.35.43
Division of LWO Corporation / P.O. Box 17125 / 3841 North Columbia Boulevard / Portland, Oregon 97217
Toll Free 800.459.8718 / Fax 503.286.4092 / Web www.arboria.com
1
5
3
Page 1 of 4
10/31/2008
T S
2
4
Need help?
Do you have a question about the Tuscany Arbor and is the answer not in the manual?
Questions and answers