A-S701
When checking the P.C.B.s:
• Put the rubber sheet and the cloth over this unit, Then place the sub-chassis unit on the cloth and check it. (Fig. 4)
• Connect the ground point of the sub-chassis unit to the chassis with a ground lead or the like. (Fig. 4)
• Reconnect all cables (connectors) that have been disconnected.
• When connecting the flexible flat cable, be careful with polarity.
Sub-chassis unit
Rubber sheet and cloth
Ground lead
Fig. 4
11