Operation; Power-On - Datalogic Jade X7 Quick Reference Manual

Portal scanner
Table of Contents

Advertisement

Operation

Prior to powering on the Jade unit, the installer should ensure that the Jade unit
has been grounded to earth ground. Some models have a Grounding Screw (shown
Figure 3
in
tion instructions.
CAUTION

Power-on

If scanner power is not already on, press the power switch located on the System Control Box to the ON
position. The illustration that follows show the ON/OFF Switch for both models. The scanner arch indi-
cator lights will then show the Startup indication (indicated by arch indicator lights blinking red, green,
page 7
blue as described on
If the scanner is already powered on, but in Sleep Mode (indicated by arch indicator lights blinking blue),
it can be returned to Normal Operation by a host command from the POS.
Figure 3. ON / OFF Switch and Grounding Screw Location
A
B
A
B
POS
POS
POS
POS
Quick Reference Guide
below). Reference the Jade X7 PRG for complete grounding and installa-
). Scanner startup can take several minutes.
Grounding Screw
(not present on all models)
-OR-
ON / OFF
C
D
E
C
D
E
Switch
12V,10.5A
12V
CLASS 1
WIRING
Operation
3

Advertisement

Table of Contents
loading

Table of Contents